Gujarat Technological UniversitySummer 2026 Examination

GTU 3171609 Software Project Management Summer 2026 Paper Solution & PDF

B.E. · IT Engineering · Semester 7 · Subject Code: 3171609
Download Official GTU PDF
Share:
Total Marks70 MarksExternal theory exam
Passing Marks23 Marks33% minimum cutoff
Exam Duration2.5 Hours2:30 PM – 5:00 PM
Paper Structure5 QuestionsWith internal OR choices
Jump toQ1Q2Q3Q4Q5

Question 1

14 MarksMedium
(a)

Define Software Project Management. Differentiate between Software Projects and other types of projects.

3 Marks
(b)
List and briefly explain the activities covered under Software Project Management.
4 Marks
(c)

What is a Project Charter? Explain the key elements of a project charter and discuss the factors that contribute to project success and failure.

7 Marks

Question 2

14 MarksMedium
(a)

What is the primary purpose of a Work Breakdown Structure (WBS) in project planning?

3 Marks
(b)
Compare and contrast the Waterfall and Agile software process models.
4 Marks
(c)

Explain the COCOMO model for software cost estimation. Calculate the effort and development time for an organic project with an estimated size of 60 KLOC

7 Marks
OR OPTION
(c)

Discuss the steps involved in selecting an appropriate project approach. What factors influence the choice of a Software Development Life Cycle (SDLC) model?

7 Marks

Question 3

14 MarksMedium
(a)
Define the terms 'Critical Path' and 'Slack Time' in the context of project scheduling.
3 Marks
(b)

Draw a Gantt chart for a simple project with at least 5 tasks and explain its utility in project monitoring.

4 Marks
(c)
A project has the following activities and time estimates (in days):

Calculate the expected time and variance for each activity. Determine the critical path.

ActivityPredecessorOptimistic (a)Most Likely(m)Pessimistic (b)
A-258
BA369
CA4710
DB,C246
7 Marks
OR OPTION
(a)
What is the purpose of Earned Value Analysis (EVA)?
3 Marks
(b)

Explain the three key dimensions of Earned Value Analysis: Planned Value (PV), Earned Value (EV), and Actual Cost (AC)

4 Marks
(c)

A project has a budget of $100,000 and a schedule of 10 months. After 5 months, the Planned Value (PV) is 50,000,theEarnedValue(EV)is50,000, the Earned Value (EV) is40,000, and the Actual Cost (AC) is $60,000. Calculate Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI), and Cost Performance Index (CPI). Interpret the results.

7 Marks

Question 4

14 MarksMedium
(a)
Define 'Risk' in the context of software project management.
3 Marks
(b)

List and explain the various risk categories as per the software project management perspective.

4 Marks
(c)

Explain the Risk Management process. Discuss any two potential risk treatment strategies with suitable examples.

7 Marks
OR OPTION
(a)
What is a 'baseline' in Software Configuration Management (SCM)?
3 Marks
(b)
Explain the importance of Version Control and Change Control in SCM.
4 Marks
(c)

Describe the SCM process with a neat diagram. What are the goals of effective Software Configuration Management?

7 Marks

Question 5

14 MarksMedium
(a)

What is the difference between Software Quality Assurance (SQA) and Software Quality Control (SQC)?

3 Marks
(b)
Briefly explain the key components of the Capability Maturity Model (CMM).
4 Marks
(c)

What is Software Re-engineering? Explain the Software Re-engineering Process Model. Discuss the technical problems associated with re-engineering.

7 Marks
OR OPTION
(a)
Why is Project Closure an important phase in the project management life cycle?
3 Marks
(b)

What are the key components typically included in a Project Closure Analysis Report?

4 Marks
(c)

"Business Process Re-engineering (BPR) often drives Software Re-engineering." Justify this statement with a suitable example. Discuss the challenges in implementing BPR.

7 Marks
College Exam Groups

Studying for Software Project Management?

Circulate this solved paper with KaTeX formulas and 1-click AI step solvers to your batchmates on WhatsApp or Telegram.

About this Examination Paper & Attribution

Official Gujarat Technological University (GTU) examination paper and step-by-step solutions for Software Project Management (Summer 2026, B.E. · IT Engineering, Sem 7). Features complete 70-mark regular & remedial examination pattern, official marking distribution across all 5 questions, and direct 1-click official PDF download.

Transcribed for student exam preparation from Gujarat Technological University official examination archives. Questions, syllabus guidelines, and curriculum marking schemes remain the intellectual property of Gujarat Technological University.

Download PDF