Gujarat Technological UniversitySummer 2026 examination

GTU 2170901 Interconnected Power System Summer 2026 Question Paper & PDF

B.E. · Electrical Engineering · Semester 7 · Subject code 2170901
Download official PDFView PDF here
Share with your class
Total
70 marks
To pass
23 marks (33%)
Duration
2.5 Hours 2:30 PM – 5:00 PM
Questions
5 with internal choice
No solutions on this paper yetNeed them for your exam? Ask once. Papers that students ask for are solved first, and we aim to add them within 24 hours.

Q.1

14 Marks
(a)
3 marks
Describe the advantages of interconnections of power systems in details.
(b)
4 marks
What is Power system Islanding? Discuss the effect of Islanding.
(c)
7 marks
Explain methods used for voltage control in power systems.

Q.2

14 Marks
(a)
3 marks
Define terms : (a) Graph (b) tree (c) co-tree
(b)
4 marks
Explain power system restoration after cascade tripping.
(c)
7 marks

Discuss ZBUS building algorithm. Explain all types of modifications when transmission lines are added between buses.

(c)
7 marks

A three Bus, three line systems is shown in Figure-1, each line has as series impedance of (0.05+j0.15) p.u., and the shunt admittance is neglected. Find YBUS. Figure-1

GTU Interconnected Power System (2170901) Summer 2026 Question 2 OR (c) Diagram

Q.3

14 Marks
(a)
3 marks
State the assumptions made for load flow studies.
(b)
4 marks

By using Gauss-Seidel method determine the voltages V1 and V2 of following set of linear equations: 10V1+2V2 = 10 ; 4V1+7V2 = 15

(c)
7 marks
Compare Newton-Raphson method with Gauss-Seidal method.
(a)
3 marks
Derive static load flow equations.
(b)
4 marks
What is the importance of slack bus in power system?
(c)
7 marks
Give the algorithm with flow chart for a fast decoupled load flow solution.

Q.4

14 Marks
(a)
3 marks
Define penalty factor.
(b)
4 marks
Define power system stability and give its classification.
(c)
7 marks
Write short note on unit commitment.
(a)
3 marks
Draw Heat rate curve and Incremental rate curve with appropriate notation.
(b)
4 marks
List out methods to improve transient stability of the power system.
(c)
7 marks
Determine transmission loss formula using Kron’s method.

Q.5

14 Marks
(a)
3 marks
Discuss the factors affecting steady transient stability.
(b)
4 marks
Discuss transient stability conditions using equal area criteria.
(c)
7 marks
A 100 MVA, 2 pole, 60 Hz generator has a moment of inertia 50×103 Kg.m3
1)What is energy stored in the rotor at rated speed?
2)What is corresponding angular momentum?
3)Determine the inertia H.
4)If the input to generator is suddenly increased by 25 MW, determine the rotor acceleration.
(a)
3 marks
Discuss the factors affecting steady state stability.
(b)
4 marks
Why steady state limit is higher than transient stability limit?
(c)
7 marks
Discuss the dynamics of synchronous machine and hence derive the swing equation.

Also write stability condition from swing curve.

More Interconnected Power System papers

Questions repeat across sessions. Working through two or three papers shows you which topics GTU asks most.

Preparing with friends?

Send this paper to your class group. Every question has its own link.

About this paper

Official Gujarat Technological University (GTU) examination paper for Interconnected Power System (Summer 2026, B.E. · Electrical Engineering, Sem 7). Features complete 70-mark regular & remedial examination pattern, official marking distribution across all 5 questions, and direct 1-click official PDF download.

Transcribed for student exam preparation from Gujarat Technological University official examination archives. Questions, syllabus guidelines, and curriculum marking schemes remain the intellectual property of Gujarat Technological University.

ViewDownload PDF