Gujarat Technological UniversitySummer 2025 examination

GTU 3160610 Water Resources Engineering and Hydrology Summer 2025 Question Paper & PDF

B.E. · Civil Engineering · Semester 6 · Subject code 3160610
Download official PDFView PDF here
Share with your class
Total
70 marks
To pass
23 marks (33%)
Duration
2.5 Hours 10:30 AM – 1:00 PM
Questions
5 with internal choice
No solutions on this paper yetNeed them for your exam? Ask once. Papers that students ask for are solved first, and we aim to add them within 24 hours.

Q.1

14 Marks
(a)
3 marks
Write brief note on any one dam located in Gujarat state.
(b)
4 marks
Define following terms:

Aquifer

2)Aquiclude
3)Aquifuge &
4)Aquitard
(c)
7 marks

State Dalton’s Law of evaporation. Explain various methods adopted to evaluate rate of evaporation.

Q.2

14 Marks
(a)
3 marks
Describe various forms of precipitation.
(b)
4 marks
Discuss various causes of flood.
(c)
7 marks
Explain method of determining direct runoff from a given storm hydrograph.
(c)
7 marks

Time (Hour) 1 2 3 4 5 6 7 8 Hourly rainfall (cm) 0.4 1.0 1.8 2.6 2.0 1.5 1.2 0.5 A storm with 12 cm precipitation produces a direct surface runoff of 7.2 cm. The time duration of the storm is given in below table. Determine Ø – index of the storm.

Q.3

14 Marks
(a)
3 marks
Write brief note on gravity dam with its salient features
(b)
4 marks
Describe various methods to find out missing rainfall data.
(c)
7 marks
Discuss recuperation test to estimate safe yield of an open well
(a)
3 marks
Discuss briefly isohyetal method to determine average depth of precipitation.
(b)
4 marks
Discuss briefly any four drainage basin characteristics.
(c)
7 marks
Discuss various types of energy dissipation devices used below spillway

Q.4

14 Marks
(a)
3 marks
Explain assumptions of unit hydrograph theory.
(b)
4 marks
Enumerate principles and objectives of water resources planning
(c)
7 marks
What is runoff? Discuss various factors affecting runoff from catchment area.
(a)
3 marks
Differentiate Hydrograph and Hyetograph.
(b)
4 marks
What is S-hydrograph? What are its uses?
(c)
7 marks
Explain the procedure of determine capacity of reservoir using mass curve method.

Q.5

14 Marks
(a)
3 marks
Write short note on run-off enhancement.
(b)
4 marks
Classify hydropower plant based on head of water and plant capacity.
(c)
7 marks
Explain various non-structural mitigation measures are adopted to control flood.
(a)
3 marks
Define and classify draught.
(b)
4 marks
Discuss channel improvement works as flood control measure.
(c)
7 marks

Enumerate various water resources projects effects on environment and ecological balance.

Preparing with friends?

Send this paper to your class group. Every question has its own link.

About this paper

Official Gujarat Technological University (GTU) examination paper for Water Resources Engineering and Hydrology (Summer 2025, B.E. · Civil Engineering, Sem 6). Features complete 70-mark regular & remedial examination pattern, official marking distribution across all 5 questions, and direct 1-click official PDF download.

Transcribed for student exam preparation from Gujarat Technological University official examination archives. Questions, syllabus guidelines, and curriculum marking schemes remain the intellectual property of Gujarat Technological University.

ViewDownload PDF